Periodic inspections of electrical panels: reports, findings and follow-up work
How to keep records of the yearly electrical installation and earthing inspection: what the record holds, minor and major defects, a work order for every finding, and the next date.
· 7 min read
At a factory, a hotel or a shopping centre, the yearly periodic inspection of the electrical installation usually goes like this. An authorised firm comes in, takes its measurements and a few weeks later sends a PDF report. On the last page, under “minor defects”, there are six items. The report stays in someone’s inbox. A year later the same firm comes back and writes the same six items again, and this time two of them have become major defects.
The problem is not the inspection; it is what happens afterwards. This guide covers how to keep a record of a periodic inspection and how to turn its findings into actual work.
1. Keep maintenance and inspection apart
They often get mixed up, but they are different things:
- Maintenance is work you or your service company do: cleaning the panel, tightening terminals, a thermographic survey, testing residual current devices. Intervals mostly come from manufacturers and practice; six months is a common starting point for switchboards.
- Periodic inspection is a statutory check by an authorised person, documented in a report. It gives an opinion on whether the installation is fit for use.
Each needs its own schedule, record and owner. Closing a maintenance work order does not mean the periodic inspection was done.
2. What the regulation says, briefly
In Turkey, periodic inspections of work equipment are governed by the regulation on health and safety in the use of work equipment (mevzuat.gov.tr). A few points that apply to panels and can be checked in the text:
- Annex III gives the inspection interval for electrical installations and earthing, lightning protection and transformers as once a year.
- Electrical installations are inspected by people from specific professions (electrical and electrical-electronics engineers, electrical technical teachers, electrical technicians, and electronics engineers up to 1 kV) who are registered in EKİPNET. The installation drawings are checked during the inspection.
- The regulation lists what the report must contain, including the instruments used and the result. Results are kept with a wet signature or a qualified electronic signature.
- Defects are classed as minor or major. A minor defect not fixed by the start of the next inspection counts as major, and equipment with a major defect must not be operated.
- Periodic inspection reports are kept for as long as the equipment is in use.
Confirm which inspections apply to your site, and the details, with your occupational safety specialist and the inspecting firm. The point here is that these rules call for a records routine.
3. What an inspection record should hold
Keeping the PDF is necessary but not enough. You should be able to answer these without opening it:
| Field | Why |
|---|---|
| Which panel or installation | What the report covers |
| Inspection date | To work out the next one |
| Inspecting firm and person | Authority and contact |
| Profession, EKİPNET registration no | Proof of authority |
| Report number | Way back to the document |
| Method or standard, instruments used | What the report rests on |
| Result: pass, pass with minor defects, fail | The state in one word |
| Minor defects, major defects | The list of work to do |
| Fit for use | A one-line decision |
| Next inspection date | The schedule |
| Report file | The document itself |
The value of having these as fields shows when a manager asks “which of our panels are due this month?” or “which ones still have open minor defects?”. Getting that out of a folder of PDFs takes an afternoon.
4. Turn every finding into work
The most valuable part of a report is the defect list, but a list does not fix itself. The rule is simple: every defect becomes a work order.
Say the report on the main distribution board at a production site in Gebze lists these minor defects:
- Earthing connection missing on the panel door
- RCD trip time not measured on two outgoing circuits, no access
- Unlabelled circuits inside the panel
Open three separate work orders for them, or, if the scope is small, one work order with three checklist items. On each:
- Note the report number and the wording of the defect.
- Set a due date. A minor defect has to be fixed before the next inspection, but leaving it for eleven months just moves the risk to the morning of that inspection. Choose a sensible window, say 30 or 60 days.
- Ask for a photo of the fix and, where it applies, a new measurement when the job closes.
A major defect is different: the equipment must not be operated. The work order is urgent, the equipment should show as down or out of service in the records, and a re-inspection needs to be booked with the inspecting firm.
5. Set the next date with the record
The next yearly inspection is the last inspection date plus one year. Write it down when you record the inspection; do not leave the arithmetic to someone later. In a good setup:
- As the date approaches (say 30 days ahead), the inspection shows as due soon.
- If the date passes with no new inspection recorded, it shows as overdue.
- When a new inspection is recorded, the old one moves into history and the new next date applies.
Start the contract and the appointment with the inspecting firm from that warning, and there is time left for steps such as the contract in İSG-KATİP.
6. Bring maintenance and inspections together on the asset
A panel’s story should be readable in one place: the six-monthly maintenance, thermographic findings, breakdowns, yearly inspection reports and the work those reports created. Keep readings as numbers too. For circuits up to 500 V, for example, insulation resistance measured at 500 V DC should be at least 1.0 MΩ (HD 60364-6, summary by EMO). A value that falls year after year gets noticed before it drops below the limit. We covered building checklists with readings in a separate post.
How this works in Saha
In Saha external inspections and periodic checks are kept as inspection records. The electrical template comes with inspection types for electrical installation and earthing, lightning protection and transformers. A record holds the date, inspecting firm and person, report number, result (pass, pass with minor defects, fail), the type’s own fields (profession, EKİPNET number, minor and major defects, fit for use, signature type, installation drawings available) and the report file. The next date defaults to the type’s interval.
Upcoming and overdue inspections show in the same list as maintenance plans. A maintenance plan can be tied to an inspection type: it opens the work order for the inspection as far ahead as you set, and the inspection is recorded against that work order. The work orders you open for findings, the inspection record and the maintenance all come together in the panel’s service history, and records can be exported as CSV. Your legal obligations stay with you; Saha keeps the records in order.
A quick review
- Are maintenance and periodic inspection tracked separately?
- Can you see each inspection’s date, firm, report number and result without opening the PDF?
- Has every defect become a work order with a due date?
- Does equipment with a major defect show as out of service?
- Does a warning come up before the next inspection is due, without anyone having to remember?
A periodic inspection report arrives once a year; its value is in what gets done with it over the next twelve months. Saha is free for 60 days with no card required, so you can create an account and record your first report with your own panels.