Spare part requests and recording used parts on the work order

A technician on site asks for a part; it is approved, prepared, handed over and recorded on the work order. How to organise that without turning it into stock management.

· 6 min read

Illustration of a gear and a box beside a part request card showing requested, approved, handed over and used steps

A technician at a patisserie in İzmir finds the fan motor in a display cabinet burnt out. He calls the office: “I need a fan motor, 220 volts, this size.” Someone takes a note and tells the storeroom; the motor is ready the next day and another technician takes it out. A week later the customer disputes the invoice: “Did this motor actually go into our cabinet?” Nobody is sure. The paper form says “part replaced”, not which part.

Parts cause constant arguments in field service because they pass through three pairs of hands: the technician who asks, the person who approves or prepares, and the technician who fits the part. This guide covers how to organise part requests and the record of parts used.

First, a boundary: this is not stock management

Organising part requests does not mean building a stock system. Quantities in the storeroom, goods in and out, shelf locations, purchase prices and invoices are a separate job, done by your accounting software or ERP. The question here is narrower: which part was requested for which job, who approved it, when was it handed over, and what was finally fitted to which unit. That belongs on the work order and in the unit’s history, not in the stock system.

1. Raise the request from inside the job

A part request should come from inside the work order, not by phone or text. That way it carries on its own:

  • Which work order and which unit it is for
  • The unit’s make, model and serial number
  • Who asked for it, and when

All the technician has to add is the part itself: one picked from the catalogue or, if it is not there, a free-text description, plus quantity, unit, urgency and, where useful, a photo of the label. The photo seems minor, but the most common reason for ordering the wrong part is a model number read out over the phone.

2. Keep a simple parts catalogue

A catalogue is not a stock list; it exists to make part names consistent. “Fan motor 10W”, “10 W fan mot.” and “evaporator fan” are three spellings of the same part, and they make it impossible to count at the end of the month how many were used.

For each part this is enough: number, name, category, brand, unit, a short description and, if you like, the stock code in your ERP. Do not keep quantities. Those live in your stock system, and a quantity kept in two places always drifts apart.

Do not try to make the catalogue complete on day one. Technicians should be able to request a part that is not in it as free text; the office adds it to the catalogue later.

3. The states of a request

A part request goes through a few steps:

State Meaning
Requested The technician asked for it
Approved / Rejected Someone with authority decided; a reason was given for a rejection
Preparing In the storeroom or with the supplier
Handed over The technician has the part
Used Fitted to the unit
Cancelled No longer needed

Not every company needs the approval step; in a two-person business the person who raises a request and the one who approves it may be the same. But for large and expensive parts (compressors, control boards, battery banks), an approval step prevents most of the later arguments with customers: nothing is ordered without the customer’s go-ahead.

Always ask for a reason when rejecting. “Rejected” on its own does not tell the technician what to do next; “The customer wants the unit replaced, not repaired” does.

4. What state is the job in while waiting?

Once a part request is raised, the job has effectively stopped. Reflect that in the work order’s status: the job moves from “in progress” to “waiting for parts” and comes back when the part is handed over. That gives you two things:

  • The office sees at a glance which jobs are held up by parts.
  • The technician’s labour time is not inflated by the days spent waiting.

One more rule: a job should not close while a part request is still open. Either the part was used or the request was cancelled. If jobs can count as done without one of those, requests nobody knows about pile up by the end of the month.

5. Record used parts separately

A request and actual use are not the same thing. The technician may have asked for two seals and fitted one. Or used a fuse from the van without raising a request at all. So when the job closes, parts used should be recorded as a separate list: which part, how many, in what unit, who fitted it, when.

That list serves two places:

  • The unit’s history. If the same display cabinet had two fan motors in three months, that is not a parts problem; it is a problem with the unit.
  • Accounting and stock. At the end of the month the list of parts used feeds invoicing and stock deductions. Your ERP does that; giving it an accurate, complete list is the job of the field record.

6. Watch how long parts take

The answer to “why did this job take so long?” is often a part. Track the time between a request being raised and the part being handed over. If it is clearly longer for one supplier, one kind of part or one region, decisions follow from it: carrying a few common parts in the technicians’ vans, or changing supplier.

How this works in Saha

Saha is not an ERP or a stock system: it does not keep storeroom quantities, goods in and out, prices or invoices. Its parts catalogue holds number, name, category, brand, unit and a field for the stock code in your ERP, but no quantity. Technicians raise part requests from inside the work order in the iOS or Android app, picking from the catalogue or typing free text, and add quantity, urgency, a note and photos. A request gets a number like PR-0031 and moves through requested, approved, rejected, preparing, handed over, used and cancelled; every step is written to the work order’s timeline.

If you choose, raising a request moves the job to “Waiting for parts”, and handing over the last open request moves it back. A job cannot close while a part request is open. Parts used can be recorded on the work order with or without a request and show in the unit’s service history. Part usage can be exported as CSV, and integration events are written when a part is used and when a request is approved, so your ERP can handle stock deductions on its side. Reports show the median time from request to hand-over.

A quick review

  • Are part requests raised from inside the work order?
  • Can a part that is not in the catalogue be requested as free text?
  • Is a reason recorded for every rejection?
  • Does a job waiting for parts have its own status?
  • Are parts used recorded separately from requests?
  • Do stock and invoicing stay in your accounting software or ERP?

A well-kept parts record settles “which unit did this part go into?” without an argument. Saha is free for 60 days with no card required; create a free account and raise your first part request.